Dynamics of Intergal-Bud facilities for August 2026
In August, Intergal-Bud continued active construction across all of its residential developments in Kyiv. Monolithic structural, façade, engineering, and finishing works are ongoing at the construction sites, along with the development of parking facilities and landscaped surrounding areas.
At Polar Park, the first building now has a fully completed monolithic structural frame, while at Kaskad Residence the first floors of two sections are actively being constructed.
We are also introducing construction progress updates for the Novi Syretski Sady residential complex, which officially launched sales in early September.
Find more details on the construction progress in our monthly report.
CITY HUB Residential Complex, address: 8–10 Mokra St.
A residential complex that harmoniously combines the comfort of urban living with the privacy and coziness of a personal space. Residents will benefit from spacious apartments, underground parking, children’s and sports areas, as well as well-developed on-site infrastructure. Scheduled construction completion — Q3 2026.
Building 2:
- Roofing works — 86%
- Façade works — 86%
- Waterproofing of the underground basement section — 100%
- Installation of metal-plastic windows and doors — 100%
- Installation of the electrical switchboard room — 99%
- Plumbing works in the basement, apartments, and common areas (water supply, sewerage, heating) — 99%
- Ventilation and smoke extraction — 86%
- Electrical installation works (apartments, common areas, basement) — 99%
- Fire protection system — 72%
- Elevator installation and commissioning — 96%
- Installation of minor metal structures — 85%
- Installation of the individual heating substation — 47%
- Landscaping and planting — 30%
- Outdoor lighting — 20%
Building 2 Parking Facility:
- Parking waterproofing — 100%
- Entrance group construction — 82%
- Electrical installation works — 94%
- Installation of the electrical switchboard room — 99%
- Plumbing works — 85%
- Ventilation and smoke extraction — 93%
- Parking floor covering — 100%
- Fire protection system — 77%
- Installation of metal doors and gates — 100%
- Installation of metal-plastic windows — 100%
- Landscaping and planting — 51%
Kaskad Residence, address: 5A Prychаlna St.
A comfort-class residential complex located just 200 metres from the Dnipro River. It combines cascading architecture, a gated territory, well-developed infrastructure, full autonomy, and energy independence. All apartments are delivered to buyers in White Box condition.
Section 1:
- Pile field construction — 100%
- Foundation base preparation (concrete preparation and waterproofing) — 100%
- Foundation slab construction — 100%
- Tower crane installation
- Construction of the monolithic reinforced concrete frame — 22%
Section 2:
- Pile field construction — 100%
- Foundation base preparation (concrete preparation and waterproofing) — 100%
- Foundation slab construction — 100%
- Tower crane installation
- Construction of the monolithic reinforced concrete frame — 3%
Section 3:
- Excavation works — 100%
Polar Park Residential Complex, address: 2 Petra Kalnyshevskoho St., Kyiv
Building No. 1:
- Monolithic structural frame — 100%
- Walls and partitions — 97%
- Installation of metal-plastic structures — 99%
- Internal water supply and sewerage systems — 57%
- Internal heating system — 52%
- Internal electrical power supply system — 63%
- Roofing works — 43%
- Elevator installation and commissioning — 13%
Building No. 2:
- Monolithic structural frame — 96%
- Walls and partitions — 64%
- Installation of ventilation shafts and prefabricated staircases — 96%
- Installation of metal-plastic structures — 35%
- Internal electrical power supply system — 20%
Building No. 3:
- Monolithic structural frame — 88%
- Walls and partitions — 44%
- Installation of ventilation shafts and prefabricated staircases — 82%
- Installation of metal-plastic structures — 10%
Parking Facility:
- Monolithic parking structure — 90%
- Walls and partitions — 24%
Sky Avenue Residential Complex, address: 3 Sviatoslava Khorobroho St.
A comfort+ class residential complex located near Sevastopolska Square. The project comprises six residential buildings with commercial premises on the ground floors and cozy internal courtyards featuring children’s and sports areas as well as leisure zones.
Building No. 3:
- Waterproofing of the underground basement section — 62%
- Entrance group construction — 85%
- Construction of external ceramic block walls — 92%
- Construction of internal ceramic block walls and partitions — 90%
- Installation of metal-plastic windows and doors — 80%
- Electrical installation works (apartments, common areas, basement) — 40%
- Roofing works — 51%
- Elevator equipment installation — 26%
- Plumbing works in the basement, apartments, and common areas (water supply, sewerage, heating) — 36%
- Installation of engineering networks in apartments with finished interiors — 23%
- Ventilation and smoke extraction — 15%
- Fire protection system — 32%
Parking Facility No. 2 (under Building No. 3):
- Parking waterproofing — 36%
- Backfilling — 50%
Preschool Educational Facility:
- Brickwork — 63%
- Waterproofing of external walls — 95%
- Backfilling — 90%
- Roofing works — 35%
Parking Facility of Syretski Sady Residential Complex, address: 10D Ivana Vyhovskoho St.
- Monolithic structural frame — 17%
Novi Syretski Sady Residential Complex, address: 10D Ivana Vyhovskoho St.
A comfort-class residential development based on the “city within a city” concept. It is an extension of the large-scale Syretski Sady residential complex, featuring updated architectural and façade solutions, modern infrastructure, and a new approach to leisure areas, children’s playgrounds, and sports facilities.
- Excavation works are ongoing
INTERGAL CITY Multifunctional Complex, address: 16B Staronavodnytska St.
A premium multifunctional complex combining elegance, futuristic architecture, advanced technology, and a unique location in Pechersk — the centre of the capital’s business, cultural, and investment life.
Tower A:
- Installation of ventilated façade systems — 99%; translucent façade structures — 98%
- Installation of internal plumbing networks: K1 — 99%, K2 — 99%, T1/T2 — 99%, V1 — 99%
- Heating mains with distribution manifolds — 99%
- Installation of ventilation systems — 96%
- Air-conditioning system installation completed — 100%; installation of unit equipment — 15%
- Fire suppression system installation — 98%
- Installation of access control and structured cabling systems — 96%
- Electrical installation works — 98%
- Boiler room installation — 97%
- Terrace surfacing — 65%
- Installation of the individual heating substation and heating modules — 97%
- Installation of apartment entrance doors — 15%
- Finishing works on technical floors (floors 23–25) — 90%
- Engineering rooms: electrical switchboard room — 97%, pump room — 97%
- Finishing of common areas (floor tiling) — 99%
- Firestop penetrations — 90%
- Installation of terrace railings — 20%
- Installation of roof metal structures — 98%
- Internal gas pipeline — 99%
- Installation of heating appliances in apartments — 50%
- Installation of technical doors — 95%
- Lobby: V1, K1, K2 engineering systems, electrical systems, air conditioning, ventilation, structured cabling system, and translucent façade glazing — 90%
- Lobby and elevator hall finishing — 80%
- Elevator installation — 100%
- Landscaping works have commenced
Tower B:
- Masonry works — 95%
- Internal plumbing works — 80%
- Installation of heating appliances — 95%
- Floor screed works — 100%
- Ventilation — 80%
- Air-conditioning systems — 60%
- Plastering works — 90%
Tower C:
- Masonry works — 99%
- Internal plumbing works — 96%
- Installation of heating appliances — 95%
- Floor screed works — 97%
- Ventilation — 30%
- Air-conditioning systems — 15%
- Structured cabling system installation — 45%
- Plastering works — 80%
Tower D:
- Masonry works — 95%
- Installation of ventilation blocks — 98%
- Installation of ventilated façade systems — 65%; translucent façade structures — 70%
- Concrete works — 97%
- Roof metal structures — 30%
- Roofing works — 90%
- Floor screed works — 45%
- Plastering works — 60%
- Concrete works — 97%
- Installation of ventilation systems — 55%
- Heating system installation — 71%
- Internal plumbing works — 75%
- Air-conditioning systems — 30%
Tower E:
- Masonry works — 90%
- Monolithic works — 99%
- Installation of ventilated façade systems — 74%; translucent façade structures — 94%
- Plastering works — 65%
- Floor screed works — 40%
- Roofing works — 59%
- Heating system installation — 30%
- Internal plumbing works — 30%
- Air-conditioning systems — 10%
- Ventilation — 10%
Building 6:
- Monolithic works — 50%
Stylobate:
- Monolithic works — 100%
- Surface covering works — 60%
Office Slope:
- Monolithic works — 95%
Parking Facility:
- Finishing works (sandblasting) — 95%
- Dismantling works — 85%
Retaining Walls:
- PS-2 — 50%
External Utility Networks:
- V1 — 60%
- K1 — 60%
- K2 — 60%
- Gas pipeline — 30%
Other publications
Promotions
Special installment plan for up to 5 years on ready-to-move-in apartments
9/28/2026Promotions
Special installment plan for ready-to-move-in duplex apartments at Sky Avenue
9/25/2026Promotions
Apartments under the “єОселя” program at Sky Avenue. Down payment from UAH 870,000.
9/25/2026News
Building No. 3 has been accredited under the state “єОселя” program with Globus Bank