In October, Intergal-Bud maintained an active pace of construction across all of its residential developments. Depending on the project, monolithic works, façade works, engineering works, and interior finishing continued at various construction sites.
More details on construction progress are available in the monthly report.
Kaskad Residence, address: 5A Prychalna St.
A comfort-class residential complex located just 200 metres from the Dnipro River. It combines cascading architecture, a gated territory, developed infrastructure, full autonomy and energy independence. All apartments are delivered to buyers in White Box condition.
Section 1:
- Construction of the monolithic reinforced concrete frame — 40%
Section 2:
- Construction of the monolithic reinforced concrete frame — 12%
Section 3:
- Pile foundation installation — 100%
Shelter No. 1:
- Construction of monolithic protective walls and floor slab — 98%
- External waterproofing and backfilling — 58%
Polar Park, address: 2 Petra Kalnyshevskoho St., Kyiv
A large-scale comfort-class residential complex in Kyiv’s Obolonskyi district. The project includes five residential buildings with a shared stylobate accommodating various infrastructure facilities and an underground parking area with a shelter. The complex combines a convenient urban location, good transport accessibility, and well-planned internal infrastructure.
Building No. 1:
- Construction of walls and partitions — 98%
- Installation of metal-plastic structures — 99%
- Internal water supply and sewerage systems — 83%
- Internal heating system — 83%
- Internal power supply system — 86%
- Installation of fire protection systems — 71%
- Wall plastering — 84%
- Floor screed installation — 65%
- Common area finishing — 46%
- Elevator installation and commissioning — 36%
- Façade works — 35%
- Roofing works — 65%
Building No. 2:
- Construction of walls and partitions — 87%
- Installation of metal-plastic structures — 57%
- Internal water supply and sewerage systems — 18%
- Internal heating system — 18%
- Internal power supply system — 22%
- Wall plastering — 8%
- Roofing works — 8%
Building No. 3:
- Construction of the monolithic frame — 95%
- Construction of walls and partitions — 59%
- Installation of ventilation shafts and precast staircases — 96%
- Installation of metal-plastic structures — 29%
Parking:
- Construction of the monolithic parking frame — 99%
- Construction of walls and partitions — 95%
- Roofing works — 25%
Sky Avenue, address: 3 Sviatoslava Khorobroho St.
A comfort+ residential complex located near Sevastopolska Square. The project comprises six residential buildings with commercial premises on the ground floors and cosy internal courtyards with children’s playgrounds, sports areas, and recreation zones.
Building No. 3:
- Waterproofing of the underground basement section — 62%
- Entrance group works — 85%
- Construction of external ceramic block walls — 100%
- Construction of internal ceramic block walls and partitions — 98%
- Roofing works — 53%
- Installation of metal-plastic windows and doors — 89.25%
- Façade works — 47%
- Plumbing works in the basement, apartments, and common areas (water supply, sewerage, heating) — 54%
- Installation of engineering systems in apartments with finished interiors — 45%
- Electrical works in apartments, common areas, and the basement — 57%
- Ventilation and smoke extraction systems — 16%
- Fire protection system — 88%
- Floor screed works in common areas and apartments — 43%
- Wall plastering in common areas and apartments — 63%
- Installation of metal doors in common areas and engineering niches — 19%
- Elevator equipment installation — 30%
Parking under Building No. 3:
- Parking waterproofing works — 75%
- Backfilling — 50%
- Ventilation and smoke extraction systems — 7%
Educational facility:
- Brickwork — 99%
- External wall waterproofing — 95%
- Backfilling — 90%
- Roofing works — 55%
- Electrical works — 25%
Syretski Sady parking, address: 10D Ivana Vyhovskoho St.
- Construction of the monolithic frame — 31%
Novi Syretski Sady, address: 10D Ivana Vyhovskoho St.
A comfort-class residential development based on the “city within a city” concept. It is an extension of the large-scale Syretski Sady residential complex, featuring updated architectural and façade solutions, modern infrastructure, and a new approach to recreation areas, children’s playgrounds, and sports facilities.
Building No. 11:
- Pile foundation installation — 42%
Building No. 12:
- Pile testing is underway
INTERGAL CITY mixed-use complex, address: 16B Staronavodnytska St.
A premium mixed-use complex combining elegance, futuristic architecture, technology, and a unique location in Pechersk — the centre of Kyiv’s business, cultural, and investment life.
Tower A:
- Installation of ventilated façade systems — 99%, façade glazing systems — 100%
- Installation of internal plumbing systems: K1 — 99%, K2 — 99%, T1/T2 — 99%, V1 — 99%
- Ventilation system installation — 96%
- Fire suppression system installation — 98%
- Access control and structured cabling systems — 96%
- Electrical works — 98%
- Boiler room installation — 97%
- Terrace finishing — 100%
- Installation of individual heating substations and heating modules — 97%
- Apartment entrance door installation — 20%
- Apartment floor screed completed — 100%
- Plastering works — 99%
- Finishing works on technical floors (floors 23–25) — 90%
- Engineering rooms: electrical switchboard room — 97%, pump room — 97%
- Common area finishing (floor tiles, wall panels, access hatches) — 60%
- Lobby finishing — 81%
- Landscaping — 50%
Tower B:
- Masonry works — 97%
- Internal plumbing works — 80%
- Heating — 76%
- Ventilation — 80%
- Air conditioning systems — 65%
- Plastering works — 97%
- Common area finishing — 97%
Tower V:
- Internal plumbing works — 96%
- Electrical works — 90%
- Heating — 75%
- Ventilation — 30%
- Air conditioning systems — 60%
- Structured cabling and access control systems — 90%
- Plastering works — 90%
Tower G:
- Masonry works — 95%
- Installation of ventilation blocks completed — 100%
- Installation of metal structures completed — 100%
- Installation of ventilated façade systems — 65%, façade glazing systems — 75%
- Roofing works — 95%
- Floor screed works — 55%
- Plastering works — 80%
- Roof metal structures — 32%
- Electrical works — 80%
Tower D:
- Monolithic works — 99%
- Installation of ventilated façade systems — 77%, façade glazing systems — 94%
- Structured cabling and access control systems — 85%
- Plastering works — 90%
- Apartment floor screed — 50%
- Common area floor screed — 52%
- Terrace waterproofing — 90%
- Waterproofing of technical floors — 90%
- Elevator installation — 10%
- Water supply and sewerage system installation — 61%
- Heating system installation — 52%
- Air conditioning systems — 10%
- Ventilation — 10%
- Electrical works — 25%
Building 6:
- Monolithic works — 50%
Stylobate:
- Surface finishing — 60%
Office slope:
- Monolithic works — 95%
Parking:
- Finishing works (sandblasting) — 95%
- Water supply and sewerage: Phase 1 — 100%, Phase 2 — 30%
- Dismantling works — 85%
- Stormwater drainage system — 15%
- Fire suppression system: Phase 1 — 75%, Phase 2 — 50%
Restaurant:
- Installation of ventilated façade systems — 90%
- Façade glazing systems — 90%
- Roof waterproofing — 50%
Retaining walls:
- RW-2 — 90%
External utilities:
- Gas pipeline — 50%
Other publications
News
Olena Ryzhova: Digitalisation and Bank–Developer Cooperation Will Support eOselia’s Growth
11/9/2026News
In Zoryan, the Intergal-Bud launched an apartment repair service from the developer.
11/5/2026News
Intergal City Receives Five-Star Recognition at the European Property Awards 2026–2027
11/2/2026Promotions
Apartment of the Month at Polar Park — Special Purchase Terms!
10/30/2026