Dynamics of construction of Intergal-Bud facilities for March 2026
In March, Intergal-Bud maintained stable construction dynamics at all facilities. Monolithic, masonry and engineering works, installation of window structures, as well as interior decoration are ongoing at the sites.
We have great news for investors of building No. 5 of the residential complex Teremky - documents have been submitted for obtaining certificates of readiness for operation.
For more details on the progress of construction work at Intergal-Bud facilities, see our monthly report.
Residential complex Syretski Sady, address: st. Ivan Vyhovsky, 10D
A modern comfort-class residential complex with the concept of "city within a city". Combines a convenient location in a green part of Kyiv and its own infrastructure.
House No. 10
- A package of documents has been submitted for obtaining a certificate of readiness for operation.
Residential complex "Teremky", address: 15 Akademika Zabolotnogo St.
A comfort-class complex surrounded by forests and parks, with modern layouts and its own developed infrastructure, 5 minutes from the metro station "Teremky".
Building No. 5
- A package of documents has been submitted to obtain a certificate of readiness for operation.
BFK INTERGAL CITY, address: st. Staronavodnytska, 16B
Premium multifunctional complex that combines elegance, futuristic architecture, technologicality and a unique location in Pechersk - the center of business, cultural and investment life of the capital.
Tower A
- Masonry - 100% readiness
- Installation of hinged ventilated facade systems (HVF) - 93%, SPOK - 98%
- Installation of internal plumbing networks: K1 - 99%, K2 - 98%, T1/T2 - 98%, B1 - 98%
- Installation of ventilation systems - 87%
- Installation of air conditioning systems - 65%
- Installation of fire extinguishing system - 75%
- Installation of SKD and SKS systems - 85%
- Screed in apartments - 87%
- Plastering of apartments - 90%
- Electrical installation works - 85%
- Installation of boiler room - 85%
- Covering of terraces - 30%
- Installation of ITP and heating modules - 85%
- Installation of doors in apartments - 15%
- Finishing works of technical floors (23-25 floors) - 60%
- Engineering premises: electrical panel - 80%, pump room - 80%
- Decoration of common areas - 20%
Tower B
- Masonry - 80%
- Internal plumbing works - 65%
- Screed - 20%
Tower B
- Masonry - 85%
- Internal plumbing works - 65%
Tower D
- Masonry - 85%
- Installation of metal structures - 50%
- Installation of ventilation units - 35%
Tower D
- Monolithic works - 95%
- Installation of NVF and SPOK systems (facade) - 60%
Building 6
- Monolithic works -50%
Stylobate
- Monolithic works - 85%
Office slope
- Monolithic works - 95%
Parking
- Finishing works (sandblasting) - 75%
- Dismantling works - 60%
Retaining walls
- PS-19 - 100%
- PS-2 - 5%
- PS-1 - 90%
External networks
- B1 - 60%
- K1 - 60%
- K2 - 60%
Gas pipeline- 20%
Polar Park residential complex, address: Kyiv, Petro Kalnyshevsky St., 2
A large-scale comfort-class residential complex in the Obolonsky district of Kyiv. It involves the construction of five buildings with a stylobate part, which will house various infrastructure facilities and underground parking with shelter. The complex combines a convenient urban location, transport accessibility and well-thought-out internal infrastructure.
House 1
- Installation of a monolithic frame - 76%
- Installation of walls and partitions - 54%
- Installation of ventilation ducts and stairs (prefabricated) - 58%
- Installation of metal-plastic structures - 28%
House 2
- Installation of a monolithic frame - 56%
- Installation of walls and partitions - 28%
- Installation of ventilation ducts and stairs (prefabricated) - 45%
House 3
- Installation of a monolithic frame - 36%
- Installation of walls and partitions - 18%
- Installation of ventilation ducts and stairs (prefabricated) - 12%
Parking
- Installation of a monolithic frame of a parking lot - 32%
CITY HUB residential complex, address: 8-10 Mokra St.
A residential complex that harmoniously combines the comfort of city life and the coziness of personal space. For the comfort of residents, spacious apartments, underground parking, children's and sports grounds, as well as its own developed infrastructure are available. The planned completion of construction is the second quarter of 2026.
House 2
- Installation of a monolithic frame - 100%
- Installation of low-current systems and electricity - 100%
- Installation of waterproofing of the basement underground part - 90%
- Installation of external brick walls - 98%
- Installation of metaplastic windows and doors - 99%
- Plumbing works in the basement, apartments and common areas (water supply, sewage, heating) - 70%
- Electrical installation works (apartments, MZK, basement) - 63.6%
- Wall decoration of common areas and apartments - 100%
Parking
- Installation of a monolithic frame for parking – 89%
- Installation of waterproofing for parking - 90%
- Installation of drainage under the parking slab of building 2 - 90%
- Installation of the foundation - 87%
- Installation of brick walls and partitions of building 2 - 86.5%
Sky Avenue residential complex, address: Svyatoslav Khorobryho St., 3
A comfort+ class complex located next to Sevastopol Square. The project includes 6 residential buildings with commercial premises on the first floors and cozy courtyards with children's and sports grounds and recreation areas.
House No. 3
- Installation of waterproofing of the basement underground part - 55%
- Installation of entrance groups - 75%
- Installation of external walls made of ceramic blocks - 61%
- Installation of internal walls and partitions made of ceramic blocks - 60%
- Installation of metal-plastic windows and doors - 35%
- Installation of small metal structures - 85%
- Electrical installation work (apartments, MZK, basement) - 14%
- Installation of the roof - 9%.
Parking lot No. 2 (under building No. 3)
- - Foundation construction - 100%
- Installation of monolithic frame parking lot - 100%
- Installation of waterproofing of parking lot - 10%
- Backfilling - 5%
Other publications
Promotions
Special installment plan for up to 5 years on ready-to-move-in apartments
9/28/2026Promotions
Special installment plan for ready-to-move-in duplex apartments at Sky Avenue
9/25/2026Promotions
Apartments under the “єОселя” program at Sky Avenue. Down payment from UAH 870,000.
9/25/2026News
Building No. 3 has been accredited under the state “єОселя” program with Globus Bank
9/24/2026