Intergal-Bud: Construction Progress April 2026
During April, Intergal-Bud maintained an active pace of construction at all facilities. During the month, a monolithic frame was formed on some complexes, work continued on underground parking lots, and engineering and masonry work and interior decoration continued in some complexes.
More details about the progress of construction work at Intergal-Bud facilities can be found in the monthly report.
Residential complex Polar Park, address: Kyiv, Petro Kalnyshevsky St., 2
A large-scale comfort-class residential complex in the Obolonskyi district of Kyiv. It involves the construction of five buildings with a stylobate part, which will house various infrastructure facilities and underground parking with shelter. The complex combines a convenient city location, transport accessibility and well-thought-out internal infrastructure.
House 1
- Installation of a monolithic frame - 92%
- Installation of walls and partitions - 61%
- Installation of ventilation ducts and stairs (prefabricated) - 91%
- Installation of metal-plastic structures - 35%
House 2
- Installation of a monolithic frame - 67%
- Installation of walls and partitions - 35%
- Installation of ventilation ducts and stairs (prefabricated) - 48%
- Installation of metal-plastic structures - 12%
House 3
- Installation of a monolithic frame - 48%
- Installation of walls and partitions - 20%
- Installation of ventilation ducts and stairs (prefabricated) - 19%
Parking
- Installation of a foundation slab - 100%
- Installation of a monolithic parking frame - 45%
CITY HUB residential complex, address: 8-10 Mokra St.
A residential complex that harmoniously combines the comfort of city life and the coziness of personal space. For the comfort of residents, spacious apartments, underground parking, children's and sports grounds, as well as its own developed infrastructure are available. Scheduled completion of construction – Q2
Building 2
- Installation of monolithic frame - 100%
- Installation of low-current systems and electricity - 100%
- Installation of roof - 50%
- Installation of waterproofing of the basement underground part - 91%
- Installation of external brick walls - 100%
- Installation of metaplastic windows and doors - 98%
- Installation of electrical panel - 95%
- Plumbing works in the basement, apartments and common areas (water supply, sewage, heating) - 70%
- Ventilation and smoke exhaust - 80%
- Electrical installation works (apartments, MZK, basement) - 95%
- Fire protection system - 50%
- Wall decoration of common areas and apartments - 100%
- Installation and commissioning of elevators - 90%
Parking lot of the building 2
- Installation of monolithic frame parking – 99%
- Installation of gypsum insulation parking - 80%
- Installation of brick walls and partitions - 73%
- Electrical installation works - 60%
- Plumbing works - 60%
- Ventilation and smoke removal - 73%
- Installation of floor covering parking - 55%
Sky Avenue residential complex, address: Svyatoslav Khorobryho St., 3
Comfort+ class complex, located next to Sevastopolskaya Square. The project includes 6 residential buildings with commercial premises on the first floors and cozy courtyards with children's and sports grounds and recreation areas.
House No. 3
- Installation of waterproofing of the basement underground part - 55%
- Installation of entrance groups - 75%
- Installation of external walls made of ceramic blocks - 69%
- Installation of internal walls and partitions made of ceramic blocks - 67%
- Installation of metal-plastic windows and doors - 40%
- Installation of small metal structures - 85%
- Electrical installation work (apartments, MZK, basement) - 31%
- Installation of the roof - 32%.
Parking lot No. 2 (under house No. 3)
- Installation of waterproofing of the parking lot - 10%
- Backfilling - 50%
BFK INTERGAL CITY, address: st. Staronavodnytska, 16B
The premium multifunctional complex INTERGAL CITY in Pechersk from the company "Intergal-Bud" demonstrates stable dynamics.
In April, active work continued at the construction site to carry out engineering, facade and interior finishing works.
Tower A
- Installation of ventilated facade systems (VFS) - 93%, SPOK - 98%
- Installation of internal plumbing networks: K1 - 99%, K2 - 98%, T1/T2 - 98%, B1 - 98%
- Installation of ventilation systems - 87%
- Installation of air conditioning systems - 65%
- Installation of fire extinguishing systems - 75%
- Installation of SKD and SKS systems - 85%
- Screed in apartments - 87%
- Plastering of apartments - 90%
- Electrical installation works - 85%
- Installation of boiler room - 85%
- Terrace covering - 30%
- Installation of ITP and heating modules - 85%
- Installation of doors in apartments - 15%
- Finishing works of technical floors (23-25 floors) - 60%
- Engineering premises: electrical panel - 80%, pumping - 80%
- Decoration of common areas - 20%
Tower B
- Masonry - 80%
- Internal plumbing works - 70%
- Screed - 40%
- Ventilation - 70%
- Air conditioning systems - 40%
Tower V
- Masonry - 85%
- Internal plumbing works - 70%
- Screed - 85%
Tower G
- Masonry - 85%
- Installation of metal structures - 90%
- Installation of ventilation blocks - 50%
Tower D
- Monolithic works - 95%
- Installation of NVF and SPOK systems (facade) - 60%
Building 6
- Monolithic works - 50%
Stylobat
- Monolithic works - 85%
Office slope
- Monolithic works - 95%
Parking
- Finishing works (sandblasting) - 75%
- Dismantling works - 60%
Retaining walls
- PS-2 - 5%
- PS-1 - 90%
External networks
- B1 - 60%
- K1 - 60%
- K2 - 60%
Other publications
Promotions
Special installment plan for up to 5 years on ready-to-move-in apartments
9/28/2026Promotions
Special installment plan for ready-to-move-in duplex apartments at Sky Avenue
9/25/2026Promotions
Apartments under the “єОселя” program at Sky Avenue. Down payment from UAH 870,000.
9/25/2026News
Building No. 3 has been accredited under the state “єОселя” program with Globus Bank
9/24/2026